Welcome toSuzhou Jinshi Steel Structure Co., Ltd.
Your location: Home > Industry news >

99% complete! The inside of Shengze station looks like this

Author: ComeFrom: Date:2024/10/21 15:29:47 Hits:33
Recently, the main building of Shengze high-speed railway station on Hu-su-hu high-speed Railway has been completed, and the interior decoration has basically been completed. At present, the system is being installed and debugged, such as circuit, broadcasting, fire fighting, air conditioning, passenger seats, etc. .
Shengze station as a whole in the architectural style and decoration fully into Shengze heritage of long-standing silk culture, showing the spirit of innovation and pragmatism.(article source:WuJiang District)
Next:High-quality development forum on building“Good houses” and“Built in China” was held in Beijing