Welcome toSuzhou Jinshi Steel Structure Co., Ltd.
Your location: Home > Product Center >

Service Hotline

0512-63210149

Floor slab

After cold rolling and forming of floor plate steel, the hot-dip galvanizing of the steel plate shall not be less than 180g / m2; the positive bending moment reinforcement of floor plate can be saved to save concrete; larger span and good seismic performance can be provided without temporary formwork and temporary support; suspension system, factory production and assembly construction can be provided to minimize the construction period.

Common models: yx-76-688, yx-76-915



                         


Nothing