After cold rolling and forming of floor plate steel, the hot-dip galvanizing of the steel plate shall not be less than 180g / m2; the positive bending moment reinforcement of floor plate can be saved to save concrete; larger span and good seismic performance can be provided without temporary formwork and temporary support; suspension system, factory production and assembly construction can be provided to minimize the construction period.